BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//lincolnikes.com//NONSGML kigkonsult.se iCalcreator 2.30.10//
CALSCALE:GREGORIAN
METHOD:PUBLISH
UID:b7405817-4935-4bea-ad7a-f41833f1a5e3
X-WR-CALDESC:A work day has been scheduled for Saturday\, February 25th\, b
 eginning at 1:00 p.m. to build multiple fish habitat devices for the youth
  pond.  If we get enough help we would also tear out the old decks on the 
 north side of the pond.\nWe want to get the pond ready for spring rains an
 d allow it to fill as soon as possible.  It will be much easier to have th
 ese habitats ready to go rather than wish they were done later on.\n\nTool
 s needed:\nManpower - bring your family.\nDrills - either electric or batt
 ery powered.\n3/4' drill bits and larger including hole saws.\nReciprocati
 ng saws - electric or battery powered. \nDrill drivers with a variety of d
 river bits - to disassembly the floating decks.  - Battery powered only.\n
 Chain Saw.\nHammer\, sledge\, nail pullers.\n\nPlease meet at the green Ro
 ck House just west of the club house.\n\nI don't expect this to take more 
 than 3 hours.  The temperature is supposed to be in the high 40's.  If you
  have muck boots you might consider bringing them just in case the pond is
  a little sticky.\n\nPlease email or call Neil so he knows how to plan.\n
 \nThank you to all of our volunteers!
X-WR-RELCALID:4f84df430023a7cd0eabd28b085880ae
X-WR-TIMEZONE:America/Chicago
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:STANDARD
TZNAME:CST
DTSTART:20221106T020000
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
RDATE:20231105T020000
END:STANDARD
BEGIN:DAYLIGHT
TZNAME:CDT
DTSTART:20220313T020000
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
RDATE:20230312T020000
RDATE:20240310T020000
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
UID:13a465e1-9992-48f7-b6f6-4405effd48ad
DTSTAMP:20260406T065928Z
DESCRIPTION:A work day has been scheduled for Saturday\, February 25th\, be
 ginning at 1:00 p.m. to build multiple fish habitat devices for the youth 
 pond.  If we get enough help we would also tear out the old decks on the n
 orth side of the pond.\nWe want to get the pond ready for spring rains and
  allow it to fill as soon as possible.  It will be much easier to have the
 se habitats ready to go rather than wish they were done later on.\n\nTools
  needed:\nManpower - bring your family.\nDrills - either electric or batte
 ry powered.\n3/4' drill bits and larger including hole saws.\nReciprocatin
 g saws - electric or battery powered. \nDrill drivers with a variety of dr
 iver bits - to disassembly the floating decks.  - Battery powered only.\nC
 hain Saw.\nHammer\, sledge\, nail pullers.\n\nPlease meet at the green Roc
 k House just west of the club house.\n\nI don't expect this to take more t
 han 3 hours.  The temperature is supposed to be in the high 40's.  If you 
 have muck boots you might consider bringing them just in case the pond is 
 a little sticky.\n\nPlease email or call Neil so he knows how to plan.\n\n
 Thank you to all of our volunteers!
DTSTART;TZID=America/Chicago:20230225T130000
DTEND;TZID=America/Chicago:20230225T150000
LOCATION:Green Rock House just west of the clubhouse
SUMMARY:Ikes Youth Pond Work Day
END:VEVENT
END:VCALENDAR
